Place of Origin: | China |
Brand Name: | Yamaha |
Certification: | smt feeder cart |
Model Number: | YG100 YG200 YG300 YG12 feeder cart |
Minimum Order Quantity: | YG feeder cart for Yamaha SMT 1 pcs accept |
---|---|
Price: | YG feeder cart for Yamaha SMT 250-500usd |
Packaging Details: | YG feeder cart for Yamaha SMT packing with carton |
Delivery Time: | YG feeder cart for Yamaha SMT within 2days after received payment |
Payment Terms: | Western Union, MoneyGram, T/T |
Supply Ability: | YG feeder cart for Yamaha SMT 5000pcs /month |
Item: | YG Feeder Cart For Yamaha SMT | Size: | 750x600x108mm |
---|---|---|---|
Layer: | Two Layers,40pcs Per Layer | Material: | 304 Stainless Steel |
Skype: | Sensenhenhao | Whatspp/wechat: | +8613424013606 |
Email: | Joy@wickon.net | Delivery: | 2-3days After Payment |
Payment: | TT, Western Union, Paypal |
Yamaha YG100 YG200 YG300 YG12 feeder storage cart,YG feeder cart for Yamaha SMT
Wickon can provide SMT equipment original new parts,
such as: Panasonic BM221 | MSF Feeder storage cart, quality assurance and price advantage,
willing to establish long-term friendly relations of cooperation.
Joy skype:sensenhenhao,whatsapp/wechat:+8613424013606
YG feeder cart for Yamaha SMT Description:
1. The feeder storage cart gives your operators a secure place to put unused feeders between
set-ups minimizing failures due to improper storage or handling.
2. When its time to prepare for the next job, the same carts can be used to “pre-kit” the placement
systems tape feeder load in positive latching feeder locations using the same numbering system as used on your placement machine.
3. When its time to change over to the next job, the cart is moved to the correct placement system,
existing feeders on the assembler are moved to an unused shelf on the cart and
the “prekitted” feeder set move from the numbered slots on the cart to the same number slot on the machine.
4. You can even dedicate on cart for use when removing the tape feeders
from the previous job and another for the current set-up minimizing changeover time.